Contact Us

If you still have questions or need technical support, please submit a request.
We’ll get back to you ASAP.

Please provide as much detail as possible, including your company name and a link to the page you need assistance with.

  • Support Portal
  • Log In
  • Home
  • Titan Maintenance & EV (TCN)
  • Implementation & Setup Guide

Checklists: Setup & Training Guide

Written by Luke Young

Updated at November 24th, 2026

Contact Us

If you still have questions or prefer to get help directly from an agent, please submit a request.
We’ll get back to you as soon as possible.

Please fill out the contact form below and we will reply as soon as possible.

  • Titan Compliance & Fuel Analytics (Edge)
    Data & Connectivity: Titan Cloud Edge Basics Environmental Compliance Fuel Analytics Integrations Facility Maintenance (Legacy) Setup & Implementation
  • Titan Supply & Logistics (TFX)
    Fuel Dispatch & Logistics Forecasting & Inventory Management Supply Management Back Office Management Buyer-side Workflows Titan Logistics Implementation & Setup Supply & Logistics Support Resources
  • Titan Maintenance & EV (TCN)
    Site User Guide Management User Guide Contractor / Supplier User Guide Implementation & Setup Guide
  • Release Notes
    Titan Cloud Edge Release Notes Titan Logistics (TFX) Release Notes Titan Maintenance & EV Release Notes
+ More

Table of Contents

Contents Companion video 1. Overview 2. Turn on Checklists 3. Create a checklist template Build a form with AI 4. Review and edit the form 5. Configure Rules Inspection result settings Template settings 6. Assign Rules Scheduled task assignment Reactive task assignment Asset field mapping Version history 7. Workflow prerequisites for scheduled tasks 8. What it looks like in the task Parent–child and bundled tasks Multiple forms on one task 9. Complete and submit a checklist 10. Adjust a live template 11. FAQ and troubleshooting
Product Guide · Maintenance
Build digital inspection forms with AI and deliver them into reactive and scheduled tasks.
November 2026 · ~10 min video

 Contents

  1. Overview
  2. Turn on Checklists
  3. Create a checklist template
  4. Review and edit the form
  5. Configure Rules
  6. Assign Rules
  7. Workflow prerequisites for scheduled tasks
  8. What it looks like in the task
  9. Complete and submit a checklist
  10. Adjust a live template
  11. FAQ and troubleshooting

Select a section to jump to it. Each section ends with a link back here.

 Companion video

The training video (Checklists_Training.mp4, 10 min) follows the same order as this guide. Each section shows a “Watch in the video” bar with the matching timestamp.

Time Video chapter Guide section
0:04 Why Checklists 1. Overview
0:50 Turn on access 2. Turn on Checklists
1:22 Create a checklist with AI 3. Create a checklist template
2:04 Preview and Designer 4. Review and edit the form
2:56 Configure Rules 5. Configure Rules
3:39 Assign Rules 6. Assign Rules
4:28 Asset field mapping 6. Assign Rules
5:09 Version history 6. Assign Rules
5:23 Scheduled task by site 8. What it looks like in the task
6:00 Workflow setup 7. Workflow prerequisites
6:20 Complete a checklist 9. Complete and submit a checklist
7:21 Inspection result 9. Complete and submit a checklist
7:38 Reactive tasks 8. What it looks like in the task
8:25 Bundled parent–child tasks 8. What it looks like in the task
9:01 Multiple forms on one task 8. What it looks like in the task
9:46 Wrap-up —

 1. Overview

Checklists lets you build digital inspection forms and deliver them straight into reactive and scheduled tasks, replacing paper inspection reports. This guide covers turning on access, building and configuring a form, and what technicians see in each task scenario.

▶  Watch in the video: Why Checklists 0:04

  • Build checklists with AI. Upload an existing PDF form and AI converts it into an editable digital checklist. At roughly 30 minutes to build each form by hand, a library of 100 forms saves 30–50 hours.
  • Works on reactive and scheduled tasks. Checklists are delivered to the right tasks and assets automatically, based on rules you set on the template.
  • One form per asset. A scheduled task by site with 4 assets gets 4 checklists. A task with no assets gets a single checklist. In a parent–child task, the parent shows every child's checklists.
  • Power BI (coming soon). Completed checklist responses will flow into Power BI for reporting across sites and assets.

↑ Back to contents

 2. Turn on Checklists

Contact Titan Cloud Support to enable Checklists for your users. Users then need the five Checklists role groups. Search for "checklist" under Role Groups and add these:

▶  Watch in the video: Turn on access 0:50

Role group What it allows
Checklists – Create or Edit Checklist (Edit) Build and edit checklist templates under System → Checklist Templates
Task Details – Save Checklists (Create) Fill in and submit a checklist on a task
Task Details – Save Checklists (View) Open a saved checklist on a task
Task Details – Timeline Checklist Response Saved (View) See checklist responses on the task Timeline
Task Details – View Checklists (View) See the Checklists tab on a task

The five Checklist role groups, found by searching "checklist" under Role Groups

The five Checklist role groups, found by searching "checklist" under Role Groups
💡  Give the Edit role group to people who build forms. Give technicians and suppliers the Task Details role groups they need.

↑ Back to contents

 3. Create a checklist template

Templates live under System → Checklist Templates. The grid lists every form with its version, last-modified date, what it's attached to and its status, with Edit, Duplicate, Deactivate and Archive actions on each row.

▶  Watch in the video: Create a checklist with AI 1:22

Checklist Templates grid

Checklist Templates grid

To create one, select + New Checklist Template and choose a starting point:

  • Start from a template: duplicate an existing checklist and adjust it.
  • Upload existing form (AI): convert a PDF into a checklist. Recommended.
  • Build from scratch: start with a blank form in the designer.

New Checklist Template: three ways to start

New Checklist Template: three ways to start

Build a form with AI

  1. Select Upload existing form, then Choose File and pick the PDF. It must be a PDF.
  2. Enter a Template name.
  3. Select Create & open builder. Conversion can take a minute.
  4. Review the result in Preview, then fix anything in Designer before you save.

Uploading a PDF form for AI conversion

Uploading a PDF form for AI conversion
💡  If a PDF doesn't convert or save cleanly, try a different file, or contact Titan Cloud Support and include the file. Expect AI to get a form 90–95% of the way there; someone still needs to check it.

↑ Back to contents

 4. Review and edit the form

The Build Form tab holds the form builder. Most forms only need two of its tabs: Preview and Designer.

▶  Watch in the video: Preview and Designer 2:04

  • Preview shows the form exactly as a technician will fill it in. Use it to check what AI produced.
  • Designer is a drag-and-drop builder, similar to Microsoft Forms or Google Forms. The toolbox on the left holds every question type (text, dropdown, checkboxes, matrix, signature, dynamic panel and more). Drag a question onto a page, then set its title, choices and required flag in the panel on the right.

Preview of an AI-generated form

Preview of an AI-generated form

Designer: toolbox on the left, question settings on the right

Designer: toolbox on the left, question settings on the right
💡  The Themes, Logic and JSON Editor tabs are also available for advanced changes; this guide doesn't cover them. Building a long form by hand takes a while, which is why AI upload is the recommended starting point.

↑ Back to contents

 5. Configure Rules

The Configure Rules tab decides how much say the inspector has over the inspection result, and what happens when a checklist is submitted. It matters most for scheduled inspection tasks.

▶  Watch in the video: Configure Rules 2:56

Inspection result settings

Pick one of three modes:

Mode Setting What the inspector does Best for
Set the result Allow inspector to set inspection result on On submit, a pop-up asks for the overall result (pass, fail or your own result list). It updates the Inspection tab directly. Inspectors you trust to make the call
Recommend a result Allow inspector to recommend inspection result on Picks a recommended result. Someone on your team confirms the final result on the Inspection tab. When you want a second check
Form only Both off Completes the form and never touches the inspection result. When your team sets results itself

Allow inspector to set inspection result, with a preview of the result pop-up

Allow inspector to set inspection result, with a preview of the result pop-up

Template settings

  • Require checklist before inspection result: the inspection result can't be set until the checklist is completed.
  • Attach document to Documents tab on submission: the submitted checklist is saved as a PDF on the task's Documents tab, so it reaches the document library automatically.

Template settings

Template settings

↑ Back to contents

 6. Assign Rules

The Assign Rules tab decides which tasks get the checklist and which asset data pre-fills it. Add one row per rule with + Add rule. Rules are checked in Priority order.

▶  Watch in the video: Assign Rules 3:39 · Asset field mapping 4:28 · Version history 5:09

Scheduled task assignment

Scheduled tasks receive checklists through their instruction.

  1. Pick the Instruction (for example, Monthly Tank Inspection).
  2. Optionally narrow by Site Channel 1–3, specific Sites or a Supplier. Leave them blank to apply everywhere.

The checklist appears on every task generated from that instruction, including tasks that already exist. You don't need to create the checklist before the scheduled task.

Reactive task assignment

Reactive tasks receive checklists through the repair matrix.

  1. Pick the matrix path in Matrix 1–3 (for example, Tanks → Diesel). Go as general or as specific as you need.
  2. Optionally narrow by Site Channel 1–3.
  3. Optionally pick Workflow Status, so the checklist only opens at a given stage (for example, Standard Advanced Reactive → Arrived).

For scheduled tasks, the equivalent status gating is set in the workflow itself (see Workflow prerequisites).

Asset field mapping

Mapping pre-fills form questions from the asset registry, so technicians don't retype asset details.

  1. Under Asset matrix, pick the asset types the checklist applies to (for example, Standard → Fuel Systems → Tanks → Diesel).
  2. Select + Add mapping, then pair an Asset Registry Field (Manufacturer, Model and so on) with the form question it fills.
  3. Turn on Read-only on form to stop technicians from changing the value.
  4. Select Save Changes.

Assign Rules: scheduled and reactive assignment plus asset field mapping

Assign Rules: scheduled and reactive assignment plus asset field mapping

On the task, each asset's checklist shows its own registry values in the mapped questions.

Mapped asset values shown read-only on the task's checklist

Mapped asset values shown read-only on the task's checklist

Version history

The Version History tab lists each saved version with its creation date, author and status, plus a preview of that version.

Version History

Version History

↑ Back to contents

 7. Workflow prerequisites for scheduled tasks

Scheduled tasks need two workflow settings before the checklist and Inspection tab behave as expected. Both are under System → Configuration → Workflows, on the Scheduled Tasks tab.

▶  Watch in the video: Workflow setup 6:00

  1. Open the scheduled task workflow (for example, Standard Core Inspection).
  2. Open the status where checklists should be available, go to Features and turn on Supplier on site. Select OK.
  3. Edit the workflow itself and turn on Inspection Workflow. Select OK.
  4. Save the workflow.

Status Features: Supplier on site turned on

Status Features: Supplier on site turned on

Edit Workflow: Inspection Workflow turned on

Edit Workflow: Inspection Workflow turned on
⚠️  If the save fails with a message about a delayed transition, a status in that workflow has a delayed transition with 0 days. Set the delay above 0 and save again.

↑ Back to contents

 8. What it looks like in the task

Checklists appear on a Checklists tab on the task. A counter at the top (for example, "0 of 8 checklists submitted") tracks progress. Below it, one pill per asset or child task lets the technician switch between forms, and a red or green dot shows each one's status.

▶  Watch in the video: Scheduled by site 5:23 · Reactive 7:38 · Parent–child 8:25 · Multiple forms 9:01

Checklists tab on a scheduled task by site with one asset

Checklists tab on a scheduled task by site with one asset
Scenario Checklists on the task How it looks
Scheduled task by site One per asset at the site; one in total if the task has no assets One pill per asset
Scheduled task by asset One per task, since each task has one asset A single pill
Reactive task One per matching assignment rule Same layout as scheduled tasks
Parent–child (bundled) tasks The child view shows its own checklists; the parent shows every child's One pill per child asset; 4 children × 2 assets = 8 checklists on the parent
Multiple forms on one task One per form per asset Each pill opens a menu to pick the form

The same checklist on a reactive task

The same checklist on a reactive task

Parent–child and bundled tasks

When scheduled tasks are bundled into a parent, the technician completes every child's checklists from the parent task. They click through the pills to move between child assets, without opening each child task.

Parent task with 8 checklists across its child tasks' assets

Parent task with 8 checklists across its child tasks' assets

Multiple forms on one task

Assign different checklist templates to different instructions on the same scheduled task template, for example one form on the daily tank inspection instruction and another on the weekly. The task then offers both forms, and the inspector picks the right one from each pill. This suits inspections that change by frequency: a monthly check that becomes quarterly, six-monthly or annual.

Two templates, each assigned to a different instruction

Two templates, each assigned to a different instruction

Each pill offers both forms

Each pill offers both forms

↑ Back to contents

 9. Complete and submit a checklist

▶  Watch in the video: Complete a checklist 6:20 · Inspection result 7:21

  1. Open the task and go to the Checklists tab.
  2. Select the asset's pill to open its form.
  3. Fill in each page. Mapped asset fields arrive pre-filled and, if set to read-only, can't be edited.
  4. Add the signature and inspection date, then select Next through the pages and Complete on the last one.
  5. Select Save Draft to come back later, or Submit Checklist when done.

Filling in the form: mapped field, signature and inspection date

Filling in the form: mapped field, signature and inspection date

After submitting, the pill turns green and the counter updates (for example, "1 of 1 checklists submitted") with who submitted it and when. What happens to the inspection result depends on the template's Configure Rules mode:

Checklist submitted

Checklist submitted
  • Set the result: a pop-up asks for the result, which updates the Inspection tab.
  • Recommend a result: the recommendation is recorded for your team to confirm.
  • Form only: the Inspection tab is left alone.

If Attach document to Documents tab on submission is on, a PDF of the completed checklist also appears on the Documents tab.

↑ Back to contents

 10. Adjust a live template

Checklists rarely fit perfectly the first time. To change one, go to System → Checklist Templates and select Edit on its row.

To change Go to Notes
Questions, wording or layout Build Form → Designer Check the change in Preview before saving
Who sets the inspection result Configure Rules Switch between set, recommend and form only
Which tasks get the form Assign Rules Add, remove or reorder rules; new matches attach to existing tasks
Pre-filled asset data Assign Rules → Asset field mapping Add or remove mappings, or toggle read-only
When the form opens on reactive tasks Assign Rules → Workflow Status Remove the status to open it at any stage
A form you no longer use Checklist Templates grid Deactivate or Archive it
💡  Save creates a new version, which you can see under Version History. To start a similar form, use Duplicate rather than editing the original.

↑ Back to contents

 11. FAQ and troubleshooting

Does the checklist need to exist before the scheduled task is created?
No. When you assign a checklist to an instruction, it attaches itself to existing tasks from that instruction as well as new ones.
Users can't see Checklist Templates or the Checklists tab.
Check that Checklists is enabled for your account and that the user has the five role groups in Turn on Checklists.
The checklist shows on a reactive task but can't be edited.
The rule's Workflow Status probably limits it to a stage the task hasn't reached, or the user can't move the task to that stage. Remove or change the Workflow Status on the rule, then save.
Mapped fields are blank.
The task's site needs assets matching the Asset matrix on the template, and those assets need values in the mapped registry fields.
A PDF won't convert or the form won't save.
Try another PDF, or contact Titan Cloud Support and include the file.
How many checklists will a task get?
One per asset per assigned form. A parent task shows the total across all its children.

↑ Back to contents

  • Titan Maintenance & EV (TCN)

    Was this article helpful?

    Yes
    No
    Give feedback about this article

    Related Articles

    • Titan Maintenance Release Notes – November 2026 (v45.2.0): Introducing Checklists
    Titan Cloud Software

    twitter-logo linkedIn-logo youtube-logo

      © 2026 Titan Cloud Software. All Rights Reserved

      • Cookie Policy
      • Privacy Policy
      • Terms of Use
      • End User Agreement

      Knowledge Base Software powered by Helpjuice

      Expand